top of page
Client: London Luton Airport
Duration: 24 weeks
Building refurbishment to include a new HVAC system and a brick built Armoury and
Weapons Maintenance room. Scope was extended by the client to include re-cover
of low level roof with 150mm insulation boards. The kitchen design was also revised
to include extra worktop over six new fridge spaces.
bottom of page