Client: Cambridgeshire Police and Crime Commissioner
Duration: 10 weeks
This contract was for the conversion of a two-storey office building into a PPST Facility, including a new Gym, Bleep Test running lanes, a padded Scenario / Training area and Classrooms with a folding wall.
The client wanted to create a professional feeling Gym space. We worked with the Architects to develop the design, which included Grey tinted mirrors, metal dado trunking with power sockets, Aluminium chequer plate wall protection below mirrors, Gerflor ‘Powershock 300’ rubber floor tiles and Lime Green lockers to match the feature wall above mirrors.
The client also wanted to provide a Bleep Test area with six running lanes. The existing wooden sports floor had been covered with a floor covering, and we removed the floor covering, repaired, sanded and re-lacquered the wooden flooring, which came up like new.











