top of page
LLA.jpg
London Luton Airport

Client: London Luton Airport

Duration: 24 weeks 

This project was centred around a building refurbishment for the airport police force, to include a new HVAC system and a brick built Armoury and Weapons Maintenance room.  The scope was extended by the client to include re-cover of low level roof with 150mm insulation boards.  The kitchen design was also revised to include extra worktop over six new fridge spaces.

bottom of page