top of page
Client: London Luton Airport
Duration: 24 weeks
This project was centred around a building refurbishment for the airport police force, to include a new HVAC system and a brick built Armoury and Weapons Maintenance room. The scope was extended by the client to include re-cover of low level roof with 150mm insulation boards. The kitchen design was also revised to include extra worktop over six new fridge spaces.
bottom of page