top of page
Client: Henlow Church of England Academy
Duration: 56 Weeks
The project for Henlow Church of England Academy centred around the alteration and refurbishment of the existing school, to provide new facilities as part of the school’s expansion programme. This included IT, Food Tech, Science, Technology, Library, Textiles and SEND rooms. To improve the school’s accessibility, an existing staircase lobby was remodelled, with the introduction of a passenger lift to serve upper floor level.
As a result, this project was Highly Commended at the LABC Building Excellence Awards in 2023.
bottom of page